The Elements Of Mobile Concrete Batching Plant Used In Low Temperature

Writer:Admin   Time:16/01/14

     1,Mobile concrete mixing plant  the template should be removed before pouring concrete and reinforcing steel bar on the ice and snow and dirt.

     
    2,After concrete to the construction site, in order to ensure the concrete into the die temperature, must be pouring out in 15 minutes.
     
    3, it is strictly prohibited to water in concrete.
     
    4. Heavy layered pouring yhzs35 concrete batching plant concrete monolithic structure, the concrete temperature has not been poured layer on layer of concrete covering the front should not be less than 2 ℃. When using heat curing, curing temperature of not less than before 2 ℃.
     
    5, after pouring in a bare concrete surface should be finished in time covered with a waterproof material such as plastic sheeting and insulation, should use wet materials, insulation materials and should not be directly over the wet concrete surface.
     
    Contractor to do a good job after mobile concrete batching plant concrete pouring temperature, after ripping if the surface of the concrete temperature and environmental temperature difference is greater than 15 ℃, should be covered with insulating material maintenance in time, and should be based on the temperature increase the thickness of insulation material.