The Preparation Before Starting The Concrete Mixing Station

Writer:Admin   Time:16/08/16

     Concrete mixing station at the bottom of the equipment and delivery vehicles in the normal state can be produced.

    In the production process, if the onset of mixing station equipment defects, should be immediately carried out and the repair team members mechanics, electricians, protect the driver, along with another immediately recommend concrete mixer, ensure continuous concrete pouring. Mix station production process in order to avoid power failure emergencies.

    If the attack in the process of transporting vehicle mechanical defects can't discharge, should be timely make emergency repair, within the rules moment cannot repair good, the car concrete scrap processing;

    If the journey jam had adopted dredge work or bypass.

    Transmission system of the work to be loose, no abnormal noise;Belt conveyor, bucket elevator and cantilever pulling scraper transmission to smooth work to bright and braking can be high, there is no abnormal noise, no card chain.

    Measurement system  check also is very main, should check the adjustable and accuracy of measurement system, the quality of the concrete batching machine cement tank qualified;The line equipment of form a complete set to reasonable, equipment, equipment to accurately.