Tel: +86-371-65621392 | Email: info@haomei.biz

Two Step Installation Of Concrete Mixing Plant

Writer:Admin   Time:15/12/19

     As one of the commonly used building materials equipment, construction cement batching plant  equipment time the relationship between the concrete aggregate quality finished product.For concrete mixing station equipment at the same time, to help users to better development in the building materials industry.Two steps I remind users, concrete mixing station installation steps need to be accurate.

    Because of concrete plant  installation quality, will directly affect the service life of the mixer and efficient production, so installed strict mixer is a very important work.What is mainly refers to two steps: installed base and machine.
     
    Dock Installation: First concrete mixers should be installed on the concrete base of qualified. During installation, the level should be revised to maintain the level of operation of the equipment, to ensure long-term stable operation mixer, only to be left in the installation of the machine enough space for operation and maintenance, but also to other related equipment with sufficient distance not affect the operation and maintenance of other equipment.
     
    Concrete mixing plant installation: the installation of equipment v-belt wheel.Standards: size after installation, v-belt round round wide symmetry plane relative displacement shall not be greater than 2% of the center distance.;Axis parallelism is not more than 6 ‰.So be sure to check the requirements when installation.